June 15 - 18 Dad built the driveway.
First he lays the culvert...
Then brings in the gravel (luckily we've got a gravel pit just 2.5 miles to the north, so he was able to turn around the loads really quickly.)
Spreading gravel over the road liner (logging road tough!).
Graded super smooth with the Kubota...
...and then raked by hand for that zen-garden perfection.
Schramer Construction's sign next to the new driveway makes it official!
No comments:
Post a Comment